Home / Learn Verilog / Critical Path Optimisation
Critical Path Optimisation
Shorten the slowest path.
In shortShorten the slowest path.
What's actually going on
The basic idea
The critical path limits the clock speed. Reduce logic levels, add registers or restructure.
Why this comes up
Faster clocks need shorter paths.
The mechanics
Look at the timing report for the worst path.
Where it is used
- Everyday RTL design
- FPGA and ASIC projects
- Testbenches and debugging
Try it
Balanced addition treeVerilog: edit and run
Same result, shorter critical path.
Quick check
1. Critical path decides...
Slowest path.